Question: PA 9-6 For 120 consecutive days, a process engineer... For 120 consecutive days, a process engineer has measured the temperature of champagne bottles as they

PA 9-6 For 120 consecutive days, a process
PA 9-6 For 120 consecutive days, a process engineer... For 120 consecutive days, a process engineer has measured the temperature of champagne bottles as they are made ready for serving. Each day, she took a sample of 6 bottles. The average across all 720 bottles (120 days, 6 bottles per day) was 58 degrees Fahrenheit. The standard deviation across all bottles was 0.5 degrees Fahrenheit When constructing an X-bar chart, what would be the center line? a degrees Fahrenheit