Question: Part 1 : Loading ( Imposed , permanent, and wind loads ) The food processing building in Figure 1 has loads based on the follawing
Part : Loading Imposed permanent, and wind loadsThe food processing building in Figure has loads based on the follawing information:The structure is located at around m above sea level in the Western Cape and is in the middle of agricultural fields doors of m wide by m high are located on the higher side under the mezzanine.The structure is m long.The mezzanine will be used for workshops and general industrial use.The weight of the truss and purlins combined is approximately kgmRoof sheeting: mm IBR at kgmServices pipes electrical, ducts etc. jwhich could be supported on the roof or under the mezzanine floor: kPa.The permanent loed of the mezzanine floor is kPaAnswer the following questions:Calculate the permanent and imposed loading on the main structural framesDetermine: The pesk wind pressure.For the wind load cases below, calculate the line laada on the most heavily loaded structurastrame sno snowy these or the frame. the wind direction to consider are:Wind blowing from West to East with the doors being open, and The case of the wind blowing from South to North. Doors are closed and select Coi value that will give the highest Uplift values.NOTE: If a frame has two zones acting on it the use a weighted average. Use the wind pressure at the apex for ellioadings Identify the loading combinations with the required partial load factors for the ULs and SLS states.NOTE: in this case there are not fluctuating wind pressures although these often need to be considered.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
