Question: Part 1 : Total productive maintenance, lean six sigma, SMED ( 1 2 points ) A company operates one 1 0 hours shift every day
Part: Total productive maintenance, lean six sigma, SMED points
A company operates one hours shift every day to produce screws. Ideally, each screw takes second of operations. During a regular production day, it has been reported that the machines have unscheduled down time of min and screws do not match the required specifications. Given that a scheduled break of min and a setup time of min are assigned for each machine during each shift.
a Calculate the Overall Equipment Effectiveness for the machines. points