Question: PART 1 Use the grid averaging ( cross - section ) method to estimate the quantity of cut and / or fill required for a

PART 1
Use the grid averaging (cross-section) method to estimate the quantity of cut and/or fill required for a
50'50' grid with the following existing elevations at its four corners: 90.33',98.67',92.33', and 95.25'.
Assume the proposed rough grade is 96.00' for all four corners. (hint: the 96' contour line divides the
cell into two sections with equal areas)
Estimate (in loose cubic yards) the quantity of topsoil that need to be removed and stockpiled for the
above building plan. Assume 10" of topsoil that need to be removed for an area extending 4' beyond
the building footprint in each direction. The swell factor is 12 percent.
Estimate (in bank cubic yards) the volume of soil to be removed for the mass excavation of the basement
area only of the above building plan. The foundation wall thickness is l' and the bottom of the
continuous footing is 9' below the rough grade level. Assume 1' of working space on each side and an
excavation slope of 1:1.
PART 1 Use the grid averaging ( cross - section )

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!