Question: Part 3. (15 points) The following table shows the operation number and the time it takes each task to be completed. The tasks are performed

Part 3. (15 points) The following table shows the

Part 3. (15 points) The following table shows the operation number and the time it takes each task to be completed. The tasks are performed sequentially on a manufacturing line. 1 2 10.097.29 3 15.17 4 5 9.408.19 1) Determine the efficiency of this line. (7 points) 2) Which of the operations is considered the bottleneck operation? (1 point) 3) What will be the efficiency of this line if the time of the bottleneck operation can be reduced by 35%? Which operation is the new bottleneck operation? (7 points)