Question: Part A. Draw the project network diagram using the AOA diagram (activities on arcs). Part B. Using the diagram drawn in A as a basis,
Part A. Draw the project network diagram using the AOA diagram (activities on arcs).
Part B. Using the diagram drawn in A as a basis, determine the Early Event Time (ET) and Late Event Time (LT) for each node.
Part C. Determine the free float and total float for each activity.
Determine the critical step of tasks and expected duration of the project
Part D. Find the probability that the project lasts less than 30 days
Time in Days Task Best Worst Likely Immediate Conditions Conditions Conditions Predecessors Request shipping of machinery 5 4 B Clear Space 6 4 C 2 5 3 Prepare manufacturing floor with machines A,B D 5 co Train employees with the use of new machinery E Nalidation Run 8 7 CD Release product for production 2 5 3 G
Part B. Using the diagram drawn in A as a basis, determine the Early Event Time (ET) and Late Event Time (LT) for each node.
Part C. Determine the free float and total float for each activity.
Determine the critical step of tasks and expected duration of the project
Part D. Find the probability that the project lasts less than 30 days
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock