Question: PART A-C are complete and correct. I am having trouble producing the diagram for part D. Individual Assignment: Network Analysis Problems #1 and #2 Due

PART A-C are complete and correct. I am having trouble producing the diagram for part D.

PART A-C are complete and correct. I am havingPART A-C are complete and correct. I am havingPART A-C are complete and correct. I am having

Individual Assignment: Network Analysis Problems #1 and #2 Due on April 7, 2020 Network Problem #1: (45 points): Based on the table below, answer questions a, b, c, d, and e below. Activity Preceding Activity Planned Duration (in weeks) 6 2 2 Start Start A, E B . C E Start A, E GIF, B Finish D G 1 7 a. (12 points) In box below, draw a Network Logic Diagram (using MS Word or PowerPoint or some other drawing tool), based on the information in the table above and "head start" for the Network Logic Diagram as shown below. Assume that all tasks start at the earliest possible moment. ES=1 ES=11 EF=6 ES=7 ES=9 EF=13 EF=10 -A6 Starts at 1 Ends at 6 Float = 0 EF=8 B2 Starts at 7 Ends at 8 Float = 0 LS=7 LF=8 Starts at 9 Ends at 10 Float = 2 LS-11 LF=12 D3 Starts at 11 Ends at 13 Float = 2 LS=13 LF=15 LS=1 LF=6 Start Finish ES=7 EF=7 F1 ES=1 EF=1 E1 Starts at 1 Ends at 1 float = EF=6 LF=6 Starts at 7 Ends at 7 Float = 1 LF=8 LF=8 ES=9 EF=15 G7 Starts at 9 Ends at 15 Float = 0 LS=9 LF=15 b. (17 points) Characterize all paths in the network in the table below. Calculate slack and identify the Critical Path. Path Activity Durations Path Duration (Days) Critical Path(s) - No or Yes? 13 No 15 Start-A-B-C-D-Finish A-B-G A-F-G E-B-C-D E-F-G G E-B- 6 + 2 + 2 + 3 6 + 2 +7 6 +1 +7 1+ 2+ 2 +3 1+1 +7 +2+7 Yes No No 8 No 1 10 No c. (2 points) What is the value for the float (slack) of Activity E Slack for Activity E (in Days) Draft d. (12 points) Assess the impact of Activity D taking twice as long as planned. Identify the Critical Path (6 points) and fill in the high-Level Network Diagram below the Path Duration table 6 points. (1 point per correct Activity Durations * 5 paths = 5 points, 1 point per correct Path Duration * 5 paths = 5 points, 1 point per correct Critical Path *2 paths) = 2 points Path Duration (Days) 16 Path Start-A-B-C-D-Finish Start-A-B-G-Finish Start-A-F-G-Finish Start-E-B-C-D-Finish Start-E-B-G-Finish Start-E-F-G-Finish Activity Durations 6 + 2 + 2 + 6 6+2 +7 6+1 +7 1 + 2 + 2 + 6 1+1 +7 1 + 2 + 7 15 14 Critical Path(s) Yes No No No No No 11 10 Kasey Ex Individual Assignment: Network Analysis Problems #1 and #2 Due on April 7, 2020 A6 Starts at 1 Ends at 6 Float = 0 LS=1 LF=6 B2 Starts at 7 Ends at 8 Float = LS=7 C2 Starts at 9 Ends at 10 Float = 0 LS=9 LF=10 D6 Starts at 11 Ends at Float = 0 LS-11 LF=8 LS=16 Start E1 G7 Finish Starts at 1 Ends at 1 Float = 5 F1 Starts at 7 Ends at 7 Float = _ Starts at 9 Ends at 15 Float = _ e. (2 points) What is the new value for Activity E float (slack), considering the impact of Activity D taking twice as long as planned? Please indicate red arrows" in the above high-level Network Diagram. Slack for Activity E (in Days)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!