Question: Part C, speeds and modular dimensions are the same as above For a single aisle of the system that you configured in Part B, determine
Part C, speeds and modular dimensions are the same as above For a single aisle of the system that you configured in Part B, determine the following: For random storage, the expected dual command cycle time (need four shuttle operations). For the given split between single and dual command cycles, determine the total number of pallets that can be handled per hour, using E(SCT) and E(DCT).Parameters, physical, metric units data set 5 max L, m 70.20 max H, m 13.00 modular spacing per W, along aisle H, height D, depth horiz vel 4.5 vert vel 0.8 shuttle 7.5 pallets 54 pallets 10 pallet position, m 1.30 1.30 1.20 m/s m/s seconds Parameters, operation Desired storage capacity 12,500 Desired handling rate, in and out/hour 1500 Uptime 0.96 Part A, Random storage th T b E(SCT), travel, s E(SCT), total, s E(DCT), travel, s E(DCT), total, s if first iter. in Part B is 54 pallets long, there 15.60 16.25 16.25 0.960 21.24 36.24 28.68 58.68 will be more excess capacity Part B, System configuration, using only single-command operations initial pallet capacity/ aisle 1080 min. number of aisles needed 11.57 12 ound up if needed Determine the number of aisles needed, 1 machine per aisle, two rack sides, single deep, to satisfy storage and handling requirements. Try to get b close to 1 Config Aisles L, pallets H, pallets L, m H, m total pallets th b E(SCT), travel, s E(SCT), total, s cycles/hour system rate Comments 12 53 10 68.9 13 12720 15.31 16.25 16.25 0.942 21.06 36.06 95.84 1150 need more machines 13 49 WNH 10 63.7 13 12740 14.16 16.25 16.25 0.871 20.36 35.36 97.74 1271 need more machines 14 45 10 58.5 13 12600 13.00 16.25 16.25 0.800 19.72 34.72 99.55 1394 need more machines 15 42 10 54.6 13 12600 12.13 16.25 16.25 0.747 19.27 34.27 100.85 1513 STOP Part C Analysis for a single aisle single commands 0.55 dual commands 0.45 L, m H, m th ty T b E(SCT), travel, s E(SCT), total, s E(DCT), travel, s E(DCT), total, s E(CT), total, s pallets/cycle cycles/hour pallets/hour 54.6 13 12.13 16.25 16.25 0.747 19.27 34.27 25.97 55.97 44.04 1.45 78.48 113.8To calculate the expected dual command cycle time (DCT) for random storageina single aisle of the system configured in Part B, we need to consider the time it takes for four shuttle operations. Let's break down the process: 1. The shuttle retrieves the pallet from the storage location. 2. The shuttle moves to the drop-off location. 3. The shuttle drops off the pallet. 4. The shuttle returns to its initial position. The expected time for each of these operations depends on the system's configuration, shuttle speed, and modular dimensions. Once we have these values, we can sum them up to find the total expected dual command cycle time. As for the total number of pallets handled per hour, we need to use the expected single command cycle time (SCT) and the expected dual command cycle time (DCT) along with the given split between single and dual command cycles. Could you provide the specific values for shuttle speed, modular dimensions, and any other relevant parameters for the system? Once we have those, we can proceed with the calculations
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
Students Have Also Explored These Related Law Questions!