Question: Part X requires machining on a milling machine (operations A and B are required). Find the number of machines required to produce 3,000 per week.
Part X requires machining on a milling machine (operations A and B are required). Find the number of machines required to produce 3,000 per week. Assume the company will be operating 5 days per week, 18 hours per day. The following information is know.
Operation= O Standard time= ST Efficiency= E Reliability = R Scrap= S
O: A ST: 3 mins E: 95% R: 95% S: 2%
O: B ST: 5 mins E: 95% R: 90% S: 5 %
The milling machine requires tool changes and preventive maintenance after every lot of 500 parts. These changes require 30 minutes.
Part A is produced in machines 1 and 2. Part B is produced in machines 3 and 4. Part A and B are assembled in workstation 5 to create C. Assembly C is painted in process 6. Given the scrap percentages p1, p2,p3...p6, determine an equation that can be used to calculate the require input quantity to machine 1.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts