Question: PENG 3 3 1 1 - Production Engineering Fundamentals Problem Session 6 A well is to be connected to a production facility located 6 4

PENG 3311- Production Engineering Fundamentals
Problem Session 6
A well is to be connected to a production facility located 6400ft from the well. The separator operates at 200. The reservoir in the well is located at a depth of 5500ft. The following information is also know:
J=1.6bblday
Pr=2200
q0=420bpd(98% Oil)
GLR=800scfstb
No choke was used
Plot a system curve (IPR + VLP) for the well with the solution node at the wellhead (Pwh) for a tubing size of 2.441 inch ID (278 inch OD) and a flowline size of 2.5 inch ID. What system flowrate is possible for this configuration?
Construct an IPR and VLP for each of the three years below. What flowrate is possible in each of the future years?
\table[[Year,q0, bpd,qw,,bpd,GLR, scf/stb,Pr,
 PENG 3311- Production Engineering Fundamentals Problem Session 6 A well is

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!