Question: per hour. The standard processing rate for TiniTotes is 3 hours in fabrication, 2 h 0 u r s in sewing, and 1 hour in
per hour.
The standard processing rate for TiniTotes is hours in fabrication, in sewing, and hour in assembly. TubbyTotes require hours in fabrication hour in sewing and hours in assembly, whereas ToddleTotes require in each station.
The Excel layout and LP Sensitivity Report for StrollerstoGo's problem are shown in Figure and Figure respectively. Each of the following questions is independent of the others.
a How many strollers of each type should StrollerstoGo make? What is the profit? Which constraints are binding?
b How much labor time is being used in the fabrication, sewing, and assembly areas?
c How much would StrollerstoGo be willing to pay for an additional hour of fabrication time? For an additional hour of sewing time?
d Is StrollerstoGo producing any product at its maximum sales level? Is it producing any product at its minimum level?
Source: Professors Mark and Judith McKnew, Clemson University.
Consider the StrollerstoGo production problem Problem
a Over what range of costs could the TiniTote materials vary and the current production plan remain optimal? Hint: How are material costs reflected in the problem formulation?
b Suppose that StrollerstoGo decided to polish each stroller prior to shipping. The process is fast and would require and minutes, respectively, for TiniTote, TubbyTote, and ToddleTote strollers. Would this change the current production plan if hours of polishing time were available?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
