Question: per hour. The standard processing rate for TiniTotes is 3 hours in fabrication, 2 h 0 u r s in sewing, and 1 hour in

per hour.
The standard processing rate for TiniTotes is 3 hours in fabrication, 2h0urs in sewing, and 1 hour in assembly. TubbyTotes require 4 hours in fabrication hour in sewing and 3 hours in assembly, whereas ToddleTotes require 2h0urs in each station.
The Excel layout and LP Sensitivity Report for Strollers-to-Go's problem are shown in Figure 4.30 and Figure 4.31, respectively. Each of the following questions is independent of the others.
a) How many strollers of each type should Strollers-to-Go make? What is the profit? Which constraints are binding?
(b) How much labor time is being used in the fabrication, sewing, and assembly areas?
(c) How much would Strollers-to-Go be willing to pay for an additional hour of fabrication time? For an additional hour of sewing time?
(d) Is Strollers-to-Go producing any product at its maximum sales level? Is it producing any product at its minimum level?
Source: Professors Mark and Judith McKnew, Clemson University.
4-25. Consider the Strollers-to-Go production problem (Problem 4-24).
(a) Over what range of costs could the TiniTote materials vary and the current production plan remain optimal? (Hint: How are material costs reflected in the problem formulation?)
(b) Suppose that Strollers-to-Go decided to polish each stroller prior to shipping. The process is fast and would require 10,15, and 12 minutes, respectively, for TiniTote, TubbyTote, and ToddleTote strollers. Would this change the current production plan if 48 hours of polishing time were available?
 per hour. The standard processing rate for TiniTotes is 3 hours

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!