Question: Pipes are installed in a process with two resources. A worker in the first resource installs 0.1 pipes per hour and a worker in the

Pipes are installed in a process with two
Pipes are installed in a process with two resources. A worker in the first resource installs 0.1 pipes per hour and a worker in the second resource installs 1.5 pipes per hour. The first resource has 5 workers and the second resource has 1 worker. Demand occurs at the rate 0.53 pipes per hour Instruction: Round your answer to 1 decimal place. What is the utilization (%) of the second resource? %