Question: plan and organisea basic worktaskon a construction site based on the job specifications. Youmustcarefullyanalyse theinformationgiveninthe'drawingsandspecifications'beforeinitiating the work. The trainer will supervise/observe the work by standing
plan and organisea basic worktaskon a construction site based on the job specifications.
Youmustcarefullyanalyse theinformationgiveninthe'drawingsandspecifications'beforeinitiating the
work.
The trainer will supervise/observe the work by standing near the working location. The student will be required to bring all necessary PPEs required to this activity.
Taskdescriptionandcomponents:
Inthistask,thestudentisrequiredto planand organiseabasicworktaskonaconstructionsiteto construct a timber deck. The assigned project has the following three (3) team members.
Followingarethedrawingsand specificationsfortheconstructionoftimberdeck:
Specifications:
Fora4.1mLengthx3.2mwidth deck
StumpLocations
- Width3Stumps(2equalwidth1.60mcentres)
- Length5Stump(4Equallength1.025centres)
Bearers
- 2/120x35f5Structuralpine3.30mlong
- at1.025mcentresNailedorbolted together
Joists
- 120x35f5Structuralpine4.10mlong
- at.450centresfor pineDeckingor600Centresforhardwood decking
- Thedeckinggenerallylimits thejoistspacings centreseitherto 300,450,600mm.
Bearers&Joistsrespectively
Task:
planand organise abasic work task on a construction site that includes a minimum of ten (10) component tasks and a team of at least three (3) people.
Thisincludes:
- Determiningandplanningbasic worktaskactivities
- Organisingperformanceofbasicworktask.
Todoso,youwillberequiredtothefollowingactivities:
- Activity1:Determinebasicworktaskactivities
- Activity2:Planbasicworktaskactivities
- Activity3:Organiseperformanceofbasicwork task
Activity3:Organiseperformanceofbasicworktask
organiseperformanceofbasicworktaskto construct atimberdeck. To this activity, you are required to:
- Completethestepsgiven inthe'Checklist3'provided.
- Complywiththefollowing:
- Workhealthand safety(WHS)requirements
- Environmentalrequirements
- Workplacerequirements
- CompleteTemplate3andTemplate4andsubmitittothetrainer/assessor.

120x35 f5 Structural Pine Joists 2/120x35 f5 Structural Pine Bearers 1025 1025 0091 1025 Tost T 0091 1025 80(01=) 4 180% Q #4 2# 3:13 2023-07-28 6
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts