Question: please after part c please also answer the following : the firm operates 8 hours per day, 20 days per month, the monthly capacity of

at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, th it sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel) bottleneck ime is minutes per unit (round your response to iwo decimal places) time of the overall system is minutes (round your response to two decimal places) A production process at Kenneth Day Manufacturing is shown in the figure below. The driling operation occurs separately from, and simultaneously Which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parailel) a) is the bottleneck. b) The bottleneck time is: minutes per unit round your response to two decimal places) c) The throughput time of the overall system is minutes (round your response to two decimal places)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts