Question: please answer 5.1.2 . i already have 5.1.1 5.1 A Bicycle (BM1) is made up of 1 frame set (A), 2 pedals (B), 2 wheels

please answer 5.1.2 . i already have 5.1.1please answer 5.1.2 . i already have 5.1.1 5.1 A

5.1 A Bicycle (BM1) is made up of 1 frame set (A), 2 pedals (B), 2 wheels subassembly (C), 1 handlebar (D) and 3 saddle bags (E). Each wheel subassembly (C) is made up of 1 tire (F), 20 spokes (G) and 1 hub (H). The inventory information and for the bicycle is shown in the table below: Scheduled Receipts Component Lot Size Lead time (weeks) 1 On-hand Scheduled Receipts stock Quantity Week BM1 500 LFL LFL LFL 100 100 1 B 2 100 1 500 1 ml Ol 50 400 200 150 500 2 F LFL 3 G LFL 1 200 250 2 H 100 2 300 19 (5) 5.1.1 Construct the product structure tree for the bicycle. 5.1.2 Develop a Material Requirements Plan (MRP) to cover a 7 week planning period if the Master Production Schedule (MPS) shows an estimated demand or gross requirement of 1000 bicycles in weeks 6 and 750 bicycles in week 7. (25)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!