Question: please answer all components of the one problem posted Analytics Exercise 6-5 (Algo) Toshiba's Notebook Computer Assembly Line Toshihiro Nakamura, manufacturing engineering section manager, is
please answer all components of the one problem posted
Analytics Exercise 6-5 (Algo) Toshiba's Notebook Computer Assembly Line Toshihiro Nakamura, manufacturing engineering section manager, is examining the prototype assembly process sheet (shown in Exhibit 6.8) for the newest subnotebook computer model with every new model introduced, management felt that the assembly line had to increase productivity and lower costs, usually resulting in changes to the assembly process. When a new model is designed, considerable attention is directed toward reducing the number of components and simplifying parts production and assembly requirements. This new computer was a marvel of high-tech, low-cost innovation and should give Toshiba an advantage during the upcoming fall/winter selling season Production of the subnotebook is scheduled to begin in 10 days. Initial production for the new model is to be 150 units per day. increasing to 270 units per day the following week (management thought that eventually production would reach 300 units per day) Assembly lines at the plant normally are staffed by 10 operators who work at a 14.4-meter-long assembly line. The line is organized in a straight line with workers shoulder to shoulder on one side. The line can accommodate up to 12 operators if there is a need. The line normally operates for 25 hours a day lemployees work from 8:15 AM to 5.00 PM, and regular hours include one hour of unpaid lunch and 15 minutes of scheduled breaks) it is possible to run one, two or three hours of overtime, but employees need at least three days notice for planning purposes The Assembly Line At the head of the assembly line, a computer displays the daily production schedule, consisting of a list of model types and corresponding lot sizes scheduled to be desembled on the line The models are simple variations of hard disk size, memory, and bottery power. A typical production schedule includes seven or eight model types in lot sizes varying from 10 to 100 units. The models are assembled sequentially. All the units of the first model are assembled followed by all the units of the second and so on. This computer screen also indicates how for along the assembly line is in completing its daily schedule, which serves as a guide for the material handlers who supply ports to the assembly lines Exhibit 68 Notebook Computer Assembly Process Sheet TASK 1. 2. 3 4. 5. 6. 7. TASK TIME (SECONDS) 74 52 25 37 24 42 35 TASKS THAT MOST PRECEDE None Task 1 None Task 3 Task 4 Task 4 Task 4 8. 9. Assemble Cover Install LCD in Cover. Prepare Base Assembly. Install M-PCB in Base. Install CPU. Install Backup Batteries and Test. Install Accupoint Pointing Device and Wrist Rest. Install Speaker and Microphone. Install Auxiliary Printed Circuit Board (A-PCB) on M-PCB. Prepare and Install keyboard. Prepare and Install Digital VideoDrive (DVD) and Hard Disk Drive (HDD). Install Battery Pack. Insert Memory Card. Start Software Load. Software Load. Test Video Display. Test Keyboard. 47 26 Task 4 Task 4 10. 11. 27 49 Task 9 Task 10 12. 13. 14. 15. 16. 17. 10 6 9 289 60 60 Task 11 Task 12 Tasks 2, 5, 6, 7, 8, 13 Task 14 Task 15 Task 16 The daily schedules are shared with the nearby Fujihashi Parts Collection and Distribution Center Parts are brought from Fujihashi to the plant within two hours of when they are needed. The material supply system is very tightly coordinated and works well. The assembly line consists of a 14.4-meter conveyor belt that carries the computers, separated at 12-meter intervals by white stripes on the belt Workers stand shoulder to shoulder on one side of the conveyor and work on the units as they move by. In addition to the assembly workers, a highly skilled worker called a "supporter" is assigned to each line. The supporter moves along the line, assisting workers who are falling behind and replacing workers who need to take a break Supporters also make decisions about what to do when problems are encountered during the assembly process (such as a defective part). The linte speed and the number of workers vary from day to day, depending on production demand and the workers' skills and availability. Although the assembly line has 12 positions, often they are not all used. Exhibit 6.9 provides details of how the engineers who designed the new subnotebook computer felt that the new line should be organized. Exhibit 6.9. Engineers' initial design of the assembly line ASSEMBLY LINE POSITION WORKSTATION NUMBER 1 2. 2 LABOR TIME (SECONDS) 74 52 + 25 = 77 37. 24. 42 - 103 3 35. 47 26 108 TASKS 1. Assemble Cover. (74) 2. Install LCD in cover. (52) 3. Prepare Base Assembly. (25) 4. Install Main Printed Circuit Board (M-PCB) in Base. (37) 5. Install CPU (24) 6. Install Backup Batteries and Test. (42) 7. Install Accupoint Pointing Device and Wrist Rest. (35) 8. Install Speaker and Microphone: (47) 9. Install Auxiliary Printed Circuit Board (A-PCB) on M-PCB. (26) 10. Prepare and Install keyboard. (27) 11. Prepare and Install Digital Video Drive (DVD) and Hard Disk Drive (HOD): (49) 12. Install Battery Pack. (10) 13. Insert Memory Card. (6) 14. Start Software load. (9) 15. Software Load (120) 15. Software Load (120) 15. Software Load (49) 16. Test Video Display. (60) 17. Test Keyboard. (60) Empty. Empty. Empty- 27. 49 - 10 + 6 + 9 - 101 10.000 60 - 60 - 120 18 11 12 In words, the following is a brief description of what is done at each workstation: Workstation 1: The first operator lays out the major components of a computer between two white lines on the conveyor. The operator then prepares the cover for accepting the LCD screen by installing fasteners and securing a cable. Workstation 2. The second operator performs two different tasks. First, the LCD screen is installed in the cover. This task needs to be done after the cover is assembled (task 1). A second independent task done by the operator is the preparation of the base so that the Main Printed Circuit Board (M-PCB) can be installed. Workstation 3 Here the M-PCB is installed in the base. After this is done, the Central Processing Unit (CPU) and backup batteries are installed and tested Workstation 4: The Accupoint Pointing Device (touchpad) and wrist rest are installed, the speaker and microphone is installed, and the Auxiliary Printed Circuit Board (A-PCB) is installed. These are all independent tasks that can be done after the M-PCB is installed, Workstation 5: Here, tasks are performed in a sequence. First, the keyboard is installed, followed by the DVD and Hard Disk Drive (HDD). The battery pack is then installed, followed by the memory card. The computer is then powered up and a program started that loads software that can be used to test the computer Actually loading the software takes 289 seconds, and this is done while the computer travels through positions 6.7. and 8 on the assembly line. Computers that do not work are sent to a rework area where they are fixed. Only about 1 percent of the computers fall to start, and these are usually quickly repaired by the supporter. Workstation 6: The video display and keyboard are tested in this workstation After assembly, the computers are moved to a separate burn-in area that is separate from the assembly line. Here, computers are put in racks for a 24-hour, 25C burn-in of the circuit components. After burn-in, the computer is tested again, software is installed, and the finished notebook computer is packaged and placed on pallets for shipment to Toshiba distribution centers around the world. Tweaking the initial Assembly-Line Design From past experience Toshihiro has found that the initial assembly-line design supplied by the engindars often needs to be tweaked Consider the following questions that Toshihiro is considering a. If the assembly line is to be redesigned to operate at 300 units per day without using overtime, what is the maximum cycle time to meet this production rate? (Round DOWN "maximum cycle time" values to the next smallest integer) Cycle time seconds per unit b. Develop an assembly line layout with the fewest possible assembly line positions and the fewest possible workstations with labor to produce 300 units per day without using overtime. What is the efficiency of this new assembly line layout? (Round Efficiency to 2 decimal places.) Emiciency 56 In your new layout, how many workstations include labor? Number of workstations with labor workstations 4