Question: please answer all parts Using Johnson's rule for 2-machine scheduling, the sequence is: Scheduled Order Job 1 2 3 4 For the schedule developed using
please answer all parts
Using Johnson's rule for 2-machine scheduling, the sequence is: Scheduled Order Job 1 2 3 4 For the schedule developed using Johnson's rule, the total length of time taken to complete the six jobs (including the 2nd operation) = hours (enter your response as a whole number). Six jobs are to be processed through a two-step operation. The first operation involves sanding, and the second involves painting. Processing times are as follows: Job A BCDEF Operation 1 (hours) 10 3 6 12 5 14 Operation 2 (hours) 8 4 27 1 13