Question: Using Johnson's rule for 2-machine scheduling, the sequence is: Scheduled Order Job 1 F E C D B A Part 2 2 D A C
Using Johnson's rule for 2-machine scheduling, the sequence is:
| Scheduled Order | Job |
| 1 | F E C D B A |
Part 2
| 2 | D A C E F B |
Part 3
| 3 | E B A C F D |
Part 4
| 4 | A D E F C B |
Part 5
| 5 | F E B D C A |
Part 6
| 6 | B A D C E F |
Part 7
For the schedule developed using Johnson's rule, the total length of time taken to complete the six jobs (including the 2nd operation) = _____hours (enter your response as a whole number).
Part 1
Six jobs are to be processed through a two-step operation. The first operation involves sanding, and the second involves painting. Processing times are as follows:
| Job | Operation 1 (hours) | Operation 2 (hours) | ||
| A | 12 | 4 | ||
| B | 8 | 11 | ||
| C | 5 | 14 | ||
| D | 6 | 2 | ||
| E | 9 | 10 | ||
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts