Question: please answer asap for a like Prepare Job-Order Cost Sheets, Predetermined Overhead Rate, Ending Balance of WIP, Finished Goods, and CoG5 At the beginning of

Prepare Job-Order Cost Sheets, Predetermined Overhead Rate, Ending Balance of WIP, Finished Goods, and CoG5 At the beginning of June, Rhone Company had two jobs in process, Job 44 and Job 45 , with the following accumulated cost information: During June, two more jobs (46 and 47) were started. The following direct materials and direct labor costs were added to the four jobs during the month of June: Ac tre end of June, 20b544,45, and 47 were completed. Only Job 45 was sold. On June 1 , the balance in Finished Goods was zero, Required: 1. Calculate the overhead rate based on direct labor cost. The overhead rate based an direct labor cost is \%. 2. Prepare a brief job-order cost sheet for the four jobs. Show the baiance as of June 1 as well as direct materials and direct labor added in June. Apply overhead to the four jobs for the month of June, and show the ending balances. All amount cells must have an entry; enter zeros as needed. At the end of June, Jobs 44,45 , and 47 were completed. Only Job 45 was sold. On June 1 , the balance in Finished Goods was rero. Required: 1. Celculate the overhead rate based on direct labor cost. The overhead rate based on direct labor cost is o. 2. Prepare a brief job-order cost sheet for the four jobs; Show the balance as of June 1 as well as direct materials and direct labor added in June. Apply overhead to the four jobs for the month of June, and show the ending balances. All amount celis must have an entry; enter zeros as needed. 3. Calculate the ending balances of Work in Process and Finished Goods as of June 30 . 4. Calcufate the Cost of Goods Sold for June. Cost of Cioods Sold
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
