Question: please answer full question with details Question 2 Brick by Brick (BBB) is a building business that provides a range of building services to the

please answer full question with details
please answer full question with details Question 2 Brick by Brick (BBB)

Question 2 Brick by Brick (BBB) is a building business that provides a range of building services to the public. Recently they have been asked to quote for garage conversions (GC) and extensions to properties (EX) and have found that they are winning fewer GC contracts than expected. BBB has a policy to price all jobs at budgeted total cost plus 50%. Overheads are currently absorbed on a labour hour basis. BBB thinks that a switch to activity based costing (ABC) to absorb overheads would reduce the cost associated to GC and hence make them more comnetitive. A typical GC costs RO3,500 in materials and takes 300 labour hours to complete. A GC requires only one site visit by a supervisor and needs only one planning document to be raised. The typical EX costs RO 8,000 in materials and takes 500 hours to complete. An EX requires six site visits and five planning documents. In all cases labour is paid RO 15 per hour. Required: (a) Calculate the cost and quoted price of a GC and of an EX using labour hours to absorb the overheads. (b) Calculate the cost and the quoted price of a GC and of an EX using ABC to absorb the overheads. Also comment it

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!