please answer how long the project will take if only three backhoes are available
and list the order of activities of the resouce constrained project
please answer how long the project will take if
please answer how long the project will take if
please answer how long the project will take if
You have prepared the following schedule for a project in which the key resource is a backhoe. This schedule is contingent on having four backhoes. You recelve a call from your partner, Brooker, who desperately needs one of your backhoes, You tell Brooker you are willing to let him have the backhoe If you are still able to complete your project in 14 months. Develop a resource schedule to see if it is possible to complete the project in 14 months with only three backhoes. The number of backhoes required by each activity is as shown in the diagram. No splitting of activities is possible, DID D DDD UD Dn DDD 30 DED Onn Du LI Use the following order of heuristics: 1. Minimum slack, 2. Smallest duration, 3. Lowest identification number Sherloader with and sacktes 19 DestinAT2 TAPA ET20 IDFIEDS 1 2 3 2 . 0 20 1 6 2 4 1 6 20 2 . 4.10.17 2 101 1110 Hesus seduled w Use the following order of heuristics: 1. Minimum slack, 2. Smallest duration, 3. Lowest identification number 11 1 Harte [ Botations 1 2 * Schedule resource load that with and stack updates Duration: TPS 130 2 1 04 1 4 4 ola 6 9 100 2 4 41012 2 100 Besouros scheduled 5 Note: Recall, in the schedule resource load chart the time-constrained scheduling interval (ES through LF) has been shaded. Any resource scheduled beyond the shaded area will delay the project. "TPP stands for time period. How long will the project take it only three backhoes are available? time periode List the order in which you scheduled the activities of the resource-constrained project Fit Second Third Fourth Fit MacBook Air SO GO * 2 % 5 & 7 4 6 8 9 W E T Y The number of backhoes required by each activity is as shown in the diagram. No splitting of act 121 HD 000 ONO Q000 010 020 2000 Dan 222 D 212 EOS Use the following order of heuristics: 1. Minimum slack, 2. Smallest duration, 3. Lowest identification Schedule resource load chart with Es and stack updates Dorcel Durations STP TP TP TP TP STPS TAZTP BTP TP 10 TP 11 12 13 14 15 1 2 3 41 4 0 4 0 6 2 4 10 2 4 10 2 10 11 Ces scheduled savable D. Note: Recall, in the schedule resource load chart the time-constrained scheduling interval ES through LP resource scheduled beyond the shaded area will delay the project. "TP stands for time period. How long will the project take if only three backhoes are available? time periode 80 GOD

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!