Question: Please answer me if all answers, You do not have to it on that table. Clear writting will help Thanks. You are the project manager

Please answer me if all answers, You do not have

Please answer me if all answers, You do not have

Please answer me if all answers, You do not have to it on that table. Clear writting will help Thanks. You are the project manager for Sky-High Realty, a real estate company that specializes in selling high-end vacation homes for the rich and famous. The company was recently contracted to sell the winter vacation home of Steve Harris located in Aspen Colorado. The house requires some preparation work for the sale along with some administrative tasks to complete the listing. The yard is in rough shape and requires work. The lawn needs to be mowed and shrubs trimmed. The front walkway and rear patio area need to have broken paving stones replaced. The exterior siding needs to be repainted. Several broken-down trellises need to be removed or replaced. Interior design work must also be completed. The kitchen, bathroom, and hallways all require repainting. The great room and living room areas of the house need to be professionally decorated. A spare room needs to be converted back into a bedroom and the entire house needs to be staged with rental furniture for the upcoming showings. The grouting in all three of the bathrooms needs to be whitened. Two radiators are severely corroded and need to be replaced with historically accurate period pieces. A large staircase dominates the house and connects all four levels. The stairway walls need to be cleaned. The skirting board requires touch up. A small alcove at the base of the stairs needs to be cleaned out. Next to the alcove, several extremely ugly coat hooks in the entry lobby need to be removed and the wall repaired. The top three steps to the fourth-floor bedroom need to be painted. Several estate agent arrangements must also be made. The house need to be placed onto the market and entered into the MLS database. Photos need to be taken of the entire property for advertising materials. Open houses need to be scheduled which include setting up catering for visitors and private viewings need to be scheduled as needed. Using the WBS tree diagram template, create a WBS for this project. Be sure to specify major activities and define individual tasks and subtasks where applicable. Submit the WBS as a PDF document. COMPANY NAME PROJECT TITLE PROJECT MANAGER DATE PROJECT TITLE 1 Activity Title 2 Activity Title 3 Activity Title 4 Activity Title 1.1 Task 1.2 Task 1.3 Task 2.1 Task 2.2 Task 2.3 Task 3.1 Task 3.2 Task 3.3 Task 4.1 Task 4.2 Task 4.3 Task 1.1.1 1.2.1 Subtask 1.3.1 Subtask 2.1.1 Subtask 2.2.1 Subtask 2.3.1 Subtask 3.1.1 Subtask 3.2.1 Subtask 3.3.1 Subtask 4.1.1 Subtask 4.2.1 Subtask 4.3.1 Subtask Subtask 1.1.2 Subtask 1.2.2 Subtask 1.3.2 Subtask 2.1.2 Subtask 2.2.2 Subtask 2.3.2 Subtask 3.1.2 Subtask 3.2.2 Subtask 3.3.2 Subtask 4.1.2 Subtask 422 Subtask 4.3.2 Subtask 1.1.3 Subtask 1.2.3 Subtask 1.3.3 Subtask 2.1.3 Subtask 2.2.3 Subtask 2.3.3 Subtask 3.1.3 Subtask 3.2.3 Subtask 3.3.3 Subtask 4.1.3 Subtask 4.2.3 Subtask 4.3.3 Subtask 1.1.4 Subtask 1.2.4 Subtask 2.1.4 Subtask 22.4 Subtask 3.1.4 Subtask 3.2.4 Subtask 4.1.4 Subtask 4.2.4 Subtask 1.1.5 Subtask 2.1.5 Subtask 3.1.5 Subtask 4.1.5 Subtask

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!