Question: Please answer question #4 down below using 5.13 and provide an explanation of the answer and the process of getting the answer! thank you! will
Please answer question #4 down below using 5.13 and provide an explanation of the answer and the process of getting the answer! thank you! will thumbs up!!
4. You have been asked to study the impact of making two changes to how the project is organized. The first change involves using dedicated teams that would work strictly in parallel on the activities in each subproject. For example, in subproject P (product specifications) the team would work on P1, P2, P3, and P4 all in parallel. In other words, there would be no precedence relationships within a subprojectall tasks within a subproject would be worked on at the same time and each would take the same amount of time as originally specified. With this new design, all the subprojects would be done sequentially with P done first, then S, D, I, and finally V. What would be the expected impact on how long it would take to complete the project if this change were made?
ANALYTICS EXERCISE: PRODUCT DESIGN PROJECT You work for a company that makes cell phones and have as battery life, size of the phone, and features need to be been made project manager for the design of a new cell made. These details are based on how a customer uses the phone. Your supervisors have already scoped the project, so cell phone. These user specifications are redefined in terms you have a list showing the work breakdown structure, and that have meaning to the subcontractors that will actually this includes major project activities. You must plan the proj- make the new cell phone in subproject S supplier speci- ect schedule and calculate project duration. Your boss wants fications. These involve engineering details for how the the schedule on his desk tomorrow morning! product will perform You have been given the information in Exhibit 5.13. The individual components that make up the product are It includes all the activities required in the project and the the focus of subproject D. Subproject I brings all the compo- duration of each activity. Also, dependencies between the nents together, and a working prototype is built and tested. activities have been identified. Remember that the preceding Finally, in subproject V, suppliers are selected and con- activity must be fully completed before work on the follow- tracts are negotiated. ing activity can be started. Your project is divided into five major subprojects. 1. Draw a project network that includes all the activities. Subproject P involves developing specifications for the 2. Calculate the start and finish times for each activity new cell phone. Here, decisions related to such things and determine the minimum number of weeks for exhibit 5.13 Work Breakdown Structure and Activities for the Cell Phone Design Project MAJOR SUBPROJECTS/Activities ACTIVITY IDENTIFICATION DEPENDENCY DURATION (WEEKS) Product specifications (P) Market research P1 Overall product specifications P1 Hardware P2 P3 P4 2 4 5 5 P2 P3 Software S1 S2 P4 P4 5 6 D1 D2 D3 D4 S1 S1 S1 D1, D2, D3 1 2 1 4 Supplier specifications (S) Hardware Software Product design (D) Battery Display Camera Outer cover Product integration (1) Hardware User interface Software coding Prototype testing Subcontracting (M) Suppliers selection Contract negotiation 3 11 12 13 14 D4 D2 12 11, 13 4 4 4 V1 S1, S2 14, V1 10 2 V2