Question: Please. answer this question do not post some other problem answer thanks! Canine Kennels Company (CKC) manufactures two different types of dog chew toys (A

Please. answer this question do not post some other problem answer thanks!
Canine Kennels Company (CKC) manufactures two different types of dog chew toys (A and B, sold in 1,000-count boxes) that are manufactured and assembled on three different workstations (W, X, and Y) using a small-batch process (see the figure below). Batch setup times are negligible. The flowchart denotes the path each product follows through the manufacturing process, and each product's price, demand per week, and processing times per unit are indicated as well. Purchased parts and raw materials consumed during production are represented by inverted triangles. CKC can make and sell up to the limit of its demand per week; no penalties are incurred for not being able to meet all the demand. Each workstation is staffed by a worker who is dedicated to work on that workstation alone and is paid $6 per hour. Total labor costs per week are fixed. Variable overhead costs are $3,500/week. The plant operates one 8-hour shift per day, or 40 hours/week. Product A $2 Raw materials Product B Step 1 Station W (11 min) $6 Step 1 Station X (16 min) Raw materials Step 2 Station X (10 min) Purchased part Step 2 Station W (20 min) Purchased part $3, $5, Which of the three workstations, W, X, or Y has the highest aggregate workload, and thus serves as the bottleneck for CKC? Step 3 Station Y (16 min) Step 3 Station Y (10 min) with a total load time of Product: A Price: $55/unit Demand: 90 units/wk Product: B Price: $65/unit Demand: 85 units/wk minutes. (Enter your response as an integer.)Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
