Question: please answer using the answering instructions Shown in Figure 16.12 Is the BOM for a large motor assembly. An MRP system is used to schedule
please answer using the answering instructions
Shown in Figure 16.12 Is the BOM for a large motor assembly. An MRP system is used to schedule each step. For motor assemblies, the lot size is 100 units and the lead time is one week. Eighty motors/wk are assembled. There are currently 110 units In stock. The MRP record for the motor assembly is as follows: Week 0 2 NI 3 5 8. 20 IS 80 Is 30 80 Gross requirement (GR) Scheduled receipts (SR) On hand (OH) Net requirement (NR) Planned order release (POR 110 110 50 90 70 8 20 50 30 10 100 100 100 Moly Mater Mesari Hong With Me Han Assembly of the housing and drilling of the hole in the housing are done in two separate areas of the plant. The final motor assembly is done in a third area. It is proposed that the brace and shell assembly, drilling the hole, and final assembly of finished motors all be done in a single workcell. What would the BOM reflecting this change look like? Answering Instruction: Use the unit for D (units/day). Q (units), C (days) and N (deliveries). Express your BOM answers in the format (D.O.C.N) to be entered in the below box as follows: 300,20,3,1 e.g. If your results are D = 300,Q-20, C3, N= 1, enter 300,20,3,1
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock