Question: Shown in Figure 16.12 is the BOM for a large motor assembly. An MRP system is used to schedule each step. For motor assemblies, the

Shown in Figure 16.12 is the BOM for a large
Shown in Figure 16.12 is the BOM for a large
Shown in Figure 16.12 is the BOM for a large
Shown in Figure 16.12 is the BOM for a large motor assembly. An MRP system is used to schedule each step. For motor assemblies, the lot size is 100 units and the lead time is one week. Eighty motors/wk are assembled. There are currently 110 units in stock. The MRP record for the motor assembly is as follows: Week 0 1 2 3 4 5 . 80 80 80 80 80 Gross requirement (GR) Scheduled receipts (SR) On hand (OH) Net requirement (NR) Planned order release (POR) 110 110 30 50 70 90 50 30 10 100 100 100 Motor assembly Motor Motor frame Housing with hole Housing Shell Beace Assembly of the housing and drilling of the hole in the housing are done in two separate areas of the plant. The final motor assembly is done in a third area. It is proposed that the brace and shell assembly, drilling the hole, and final assembly of finished motors all be done in a single workcell. What would the BOM reflecting this change look like? From Q1, assume a lot size of 30, a hand inventory of 80, and a lead time of one week. What would the MRP record for the brace look like in terms of S- kanbans

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!