Question: PLEASE ANSWER WITH COMPLETE SOLUTIONS. 1. An assembly line with 1? tasks is to be balanced. The longest task is 2.4 minutes. and the total

PLEASE ANSWER WITH COMPLETE SOLUTIONS. 1. An assembly line with 1? tasks is to be balanced. The longest task is 2.4 minutes. and the total time for all tasks is 18 minutes. The line will operate for 4...