Question: PLEASE ANSWER WITH COMPLETE SOLUTIONS 1. An assembly line with 1? tasks is to be balanced. The longest task is 2.4 minutes. and the total

PLEASE ANSWER WITH COMPLETE SOLUTIONS

PLEASE ANSWER WITH COMPLETE SOLUTIONS 1. An
1. An assembly line with 1? tasks is to be balanced. The longest task is 2.4 minutes. and the total time for all tasks is 18 minutes. The line will operate for 45D minutes per day. a. IWhat are the minimum and maximum wcle times? b. What range of output is theoretically possible for the line? c. IWhat is the minimum number of workstations needed if the maximum output rate is to he sought? d. what cycle time will provide an output rate of 125 units per day? e. 1What output potential will result if the cycle time is {1} 9 minutes? {2} 15 minutes? 2. Refer to the diagram below. A manager wants to assign tasks to workstations as efcieme as possible and achieve an hourtilr output of 33 units. Assume the shop works a {SD-minute hour. Assign the tasks shown in the aooompa nying precedence diagram [times are in minutes} to workstations using the following rules: a. In order of most following tasks. Tiebreaker: greatest positional weight. b. In order of greatest positional weight. Tiebreaker: most following tasks. c. IWhat is the efciency

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Finance Questions!