Question: PLEASE ANSWER WITH EXCEL FORMULA'S AND SHEET G and P Manufacturing would like to minimize the labor cost of producing dishwasher motors for a major
PLEASE ANSWER WITH EXCEL FORMULA'S AND SHEET
G and P Manufacturing would like to minimize the labor cost of producing dishwasher motors for a major appliance manufacturer. Although two models of motors exist, the finished models are indistinguishable from one another; their cost difference is due to a different production sequence. The time in hours required for each model in each production area is tabled here, along with the labor cost.
|
| Model 1 | Model 2 |
| Area A | 15 | 3 |
| Area B | 4 | 10 |
| Area C | 4 | 8 |
| Cost | 80 | 65 |
Currently labor assignments provide for 10,000 hours in each of Areas A and B and 18000 hours in Area C. If 2000 hours are available to be transferred from area B to Area A, 3000 hours are available to be transferred from area C to either Areas A or B, develop the linear programming model whose solution would tell G&P how many of each model to produce and how to allocate the workforce.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
