Question: Please create a report based on my information, formally structuring everything and creating digitalized tables for everything provided. I would like you to go over

Please create a report based on my information,
Please create a report based on my information,
Please create a report based on my information,
Please create a report based on my information, formally structuring everything and creating digitalized tables for everything provided. I would like you to go over all of the data you see and analyze all of my charts. Please include everything you see in your report and make sure to include and explain all diagrams. Discuss the project network diagram and its results, such as the critical path and slack. Make the most of your imagination and produce your best work. There is no wrong answer to this problem.
There are 14 activities and all are one after the other with some lags in between. Below is the AON Diagram for the project basis the Gantt chart above. This has early start (ES), early finish (EF), late start (LS) and late finish (LF) times alongwith activity number and duration of each activity mentioned in the boxes on the nodes and the slack time mentioned below each box. Slack or Total Float is late start- early start or late finish - early finish. FS +2 12 20 5 25 126 6140 651925) 75 2095 O! Olli 01 10215 TO 5 15 140/750 55 65 25 5 26 551055 65.85 25 126 15 1125 1953 9510105 F0155 115 10:23 40 too 90 % O 478 55 50 100 801595 ES ANTER 55+5 F3410 105 LS DONATE 10520 SLACK 0 Basis the network diagram the critical path is one which has the longest time and 0 slack across all activities. The critical path is 1-2-4-5-6-8-10-12-13-14. The project total duration is 125 days. The diagram also contains lag relationships as per the Gantt chart. Mentioned below is the table with total float and free float for each activity. Free float is the difference between the early start of the successor and early finish of the predecessor. It gives the time difference and lag between 2 succeeding activities. Slack Free ID Activity Predecessor Duration ES LS EF LF Time/Total Float Float 1 Administrative & Estimate None 10 0 10 10 0 0 work 2 Excavation 1 5 10 10 15 15 0 0 3 PCC 1 5 12 20 17 25 8 8 4 Foundation 2 10 15 15 25 25 0 0 5 Back Filling 3,4 1 25 26 26 0 0 6 Beam and Plint column 5 14 26 26 40 40 0 0 7 Brick work 6 10 40 55 50 65 15 5 8 Door, Window, Lintel 6 8 47 47 55 55 0 0 9 Slab+beam 7,8 10 55 65 65 75 10 0 10 Plumbing and electricity 8 10 60 60 70 70 0 10 11 Plastering 9 20 65 75 85 95 10 10 12 Tiles 10 15 80 80 95 95 0 0 13 Paint 11,12 10 95 95 105 105 0 0 14 Finishing 13 20 105 105 125 125 0 0 25

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!