Question: PLease create this project in The P6 Primivera software Question 3.2: Develop, first graphically and then in P6, the multiple levels of the WBS hierarchy

PLease create this project in The P6 Primivera software

PLease create this project in The P6 Primivera

PLease create this project in The P6 Primivera

PLease create this project in The P6 Primivera

PLease create this project in The P6 Primivera

Question 3.2: Develop, first graphically and then in P6, the multiple levels of the WBS hierarchy of the created project with the milestones, tasks, work packages and level of effort. Note: see Table 2. Duration 0 days 1 day 103 days 28 days 86 days 10 days 108 days 10 days 66 days 10 days 5 days 30 days 0 days WBS code Task name 1 Lecture Theatre 1.1 Tender Contract Award Process 1.1.1 Contractors submit tender to Client 1.1.2 Client select contractor 1.1.3 Selected contractor team meeting 1.1.4 Final contractor process 1.2 Engineering Design 1.2.1 Developed Design activity 1.2.2 5-way Developed Design Review 1.2.3 Detailed Design activity 1.2.4 5-way Detailed Design Review 1.2.5 Construction Design Activity 1.2.6 5-way Construction Design Review 1.3 Consents 1.3.1 Apply for Building Consents 1.3.2 Authority Process Building Consents 1.3.3 Authority Issue Building Consent 1.4 Subcontractors Procurements 1.4.1 Advance works 1.4.1.1 Piling 1.4.1.2 General 1.4.1.2.1 Subcontract award 1.4.1.2.2 Subcontractor mobilises to site 1.4.1.2.3 Shop drawing production 1.4.1.2.4 Shop drawing review and approval 1.4.1.2.5 Shop drawing revised and issued by subcontractor 1.4.1.2.6 Piling from mobilisation to delivery 1.4.1.3 Demolition 1.4.1.3.1 Demolition (mobilisation to completion) 1.4.1.4 Earthworks, foundations and basement construction 1.4.1.4.1 Establishment 1.4.1.4.1.1 Mobilisation 1.4.1.4.1.2 Installation of stormwater run-off 1.4.1.4.1.3 Preparation before demolition 1.4.1.4.1.3.1 Relocate existing service (Boiler) 1.4.1.4.1.4 Demolition 1.4.1.4.1.4.1 Demolition Boiler room 1.4.1.4.1.5 1.4.1.4.1.5.1 Piling works 1.4.2 Subcontractors Procurement works 1.4.2.1 General 1.4.2.1.1 Prepare & Issue subcontract tender packages 1.4.2.1.2 Bid preparation by subcontractor 1.4.2.1.3 Assessment of subcontractors bid 5 days 10 days 20 days 10 days 5 days 20 days 58 days 10 days 20 days 20 days 10 days Piling 22 days 10 days 15 days 5 days 2 days 3 days 3 days 10 days 20 days 10 days 5 days 20 days 5 days 5 days 0 days 1.4.2.1.4 1.4.2.1.5 1.4.2.1.6 1.4.2.1.7 1.4.2.1.8 1.4.2.1.9 1.4.2.1.10 1.4.2.1.11 1.5 1.5.1 1.5.1.1 1.5.1.2 1.5.1.3 1.5.2 1.5.2.1 1.5.2.2 1.5.2.3 1.5.2.4 1.5.2.5 1.5.2.6 1.5.2.7 1.5.2.8 1.5.2.9 1.5.2.10 1.5.2.11 1.5.3 1.5.3.1 1.5.3.2 1.5.3.3 1.5.3.4 1.5.3.5 1.5.4 1.5.4.1 1.5.4.2 1.5.4.3 1.5.4.4 1.5.4.5 1.5.4.6 1.5.4.7 1.5.4.8 1.5.4.9 1.5.4.10 1.5.4.11 1.5.5 1.5.5.1 1.5.6 1.5.6.1 1.5.6.2 1.5.6.3 1.5.6.4 8 days 9 days 8 days 3 days 5 days 19 days 5 days 5 days 5 days 18 days 5 days Select subcontractor Client approves subcontractor Subcontract awarded Subcontractors mobilise to site Shop drawing production Drawing review and approval Shop drawing revised and issued by subcontractor General Fabrication/site mobilisation/delivery Construction Works General Mobilise offsite Mobilise onsite Constructions works commence on site Earthworks and foundation Temporary retention Bulk excavates for basement Detailed excavation for pile caps Box and pour pile cap Detailed excavation for pile caps Box and pour ground beams Sub-slab services Fill under slab Access-enabling works Slab on grade Access-postponed piling Structure Place and prop precast panels Stitch panel joints Place steel beams to support suspended panels Masonry walls Place metal deck flooring units & concrete topping to suspend slab Envelope Timber framing to roof Igu curtain wall cladding Acoustic roof lining Framing to perimeter guttering Perimeter guttering IGU curtain wall cladding at interface with existing near building GRC sunscreen fins Weathertight (Apron area) Colorsteel roofing Weathertight (main auditorium) Louvres on roof Interior, including building services Interior fitout & building services Completion Final testing and commissioning Final Architects inspection As-built documentations Code of compliance certificate 5 days 5 days 8 days 15 days 11 days 22 days 28 days 30 days 2 days 8 days 5 days 20 days 0 days 10 days O days 12 days 87 days 20 days 5 days 10 days 1.5.6.4.1 Contractor/Client Application 1.5.6.5 Complete Table 2: Project activities 20 days O days Question 3.2: Develop, first graphically and then in P6, the multiple levels of the WBS hierarchy of the created project with the milestones, tasks, work packages and level of effort. Note: see Table 2. Duration 0 days 1 day 103 days 28 days 86 days 10 days 108 days 10 days 66 days 10 days 5 days 30 days 0 days WBS code Task name 1 Lecture Theatre 1.1 Tender Contract Award Process 1.1.1 Contractors submit tender to Client 1.1.2 Client select contractor 1.1.3 Selected contractor team meeting 1.1.4 Final contractor process 1.2 Engineering Design 1.2.1 Developed Design activity 1.2.2 5-way Developed Design Review 1.2.3 Detailed Design activity 1.2.4 5-way Detailed Design Review 1.2.5 Construction Design Activity 1.2.6 5-way Construction Design Review 1.3 Consents 1.3.1 Apply for Building Consents 1.3.2 Authority Process Building Consents 1.3.3 Authority Issue Building Consent 1.4 Subcontractors Procurements 1.4.1 Advance works 1.4.1.1 Piling 1.4.1.2 General 1.4.1.2.1 Subcontract award 1.4.1.2.2 Subcontractor mobilises to site 1.4.1.2.3 Shop drawing production 1.4.1.2.4 Shop drawing review and approval 1.4.1.2.5 Shop drawing revised and issued by subcontractor 1.4.1.2.6 Piling from mobilisation to delivery 1.4.1.3 Demolition 1.4.1.3.1 Demolition (mobilisation to completion) 1.4.1.4 Earthworks, foundations and basement construction 1.4.1.4.1 Establishment 1.4.1.4.1.1 Mobilisation 1.4.1.4.1.2 Installation of stormwater run-off 1.4.1.4.1.3 Preparation before demolition 1.4.1.4.1.3.1 Relocate existing service (Boiler) 1.4.1.4.1.4 Demolition 1.4.1.4.1.4.1 Demolition Boiler room 1.4.1.4.1.5 1.4.1.4.1.5.1 Piling works 1.4.2 Subcontractors Procurement works 1.4.2.1 General 1.4.2.1.1 Prepare & Issue subcontract tender packages 1.4.2.1.2 Bid preparation by subcontractor 1.4.2.1.3 Assessment of subcontractors bid 5 days 10 days 20 days 10 days 5 days 20 days 58 days 10 days 20 days 20 days 10 days Piling 22 days 10 days 15 days 5 days 2 days 3 days 3 days 10 days 20 days 10 days 5 days 20 days 5 days 5 days 0 days 1.4.2.1.4 1.4.2.1.5 1.4.2.1.6 1.4.2.1.7 1.4.2.1.8 1.4.2.1.9 1.4.2.1.10 1.4.2.1.11 1.5 1.5.1 1.5.1.1 1.5.1.2 1.5.1.3 1.5.2 1.5.2.1 1.5.2.2 1.5.2.3 1.5.2.4 1.5.2.5 1.5.2.6 1.5.2.7 1.5.2.8 1.5.2.9 1.5.2.10 1.5.2.11 1.5.3 1.5.3.1 1.5.3.2 1.5.3.3 1.5.3.4 1.5.3.5 1.5.4 1.5.4.1 1.5.4.2 1.5.4.3 1.5.4.4 1.5.4.5 1.5.4.6 1.5.4.7 1.5.4.8 1.5.4.9 1.5.4.10 1.5.4.11 1.5.5 1.5.5.1 1.5.6 1.5.6.1 1.5.6.2 1.5.6.3 1.5.6.4 8 days 9 days 8 days 3 days 5 days 19 days 5 days 5 days 5 days 18 days 5 days Select subcontractor Client approves subcontractor Subcontract awarded Subcontractors mobilise to site Shop drawing production Drawing review and approval Shop drawing revised and issued by subcontractor General Fabrication/site mobilisation/delivery Construction Works General Mobilise offsite Mobilise onsite Constructions works commence on site Earthworks and foundation Temporary retention Bulk excavates for basement Detailed excavation for pile caps Box and pour pile cap Detailed excavation for pile caps Box and pour ground beams Sub-slab services Fill under slab Access-enabling works Slab on grade Access-postponed piling Structure Place and prop precast panels Stitch panel joints Place steel beams to support suspended panels Masonry walls Place metal deck flooring units & concrete topping to suspend slab Envelope Timber framing to roof Igu curtain wall cladding Acoustic roof lining Framing to perimeter guttering Perimeter guttering IGU curtain wall cladding at interface with existing near building GRC sunscreen fins Weathertight (Apron area) Colorsteel roofing Weathertight (main auditorium) Louvres on roof Interior, including building services Interior fitout & building services Completion Final testing and commissioning Final Architects inspection As-built documentations Code of compliance certificate 5 days 5 days 8 days 15 days 11 days 22 days 28 days 30 days 2 days 8 days 5 days 20 days 0 days 10 days O days 12 days 87 days 20 days 5 days 10 days 1.5.6.4.1 Contractor/Client Application 1.5.6.5 Complete Table 2: Project activities 20 days O days

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!