Question: PLEASE DO THE CALCULATIONS FOR ME STEP BY STEP. I NEED CALCULATIONS, NOT EXPLANATIONS. Thanks The director of a large engineering department is considering the
PLEASE DO THE CALCULATIONS FOR ME STEP BY STEP. I NEED CALCULATIONS, NOT EXPLANATIONS. Thanks
The director of a large engineering department is considering the rental of several
computer terminals to provide the staff with access to a shared database. Based on an
intradepartmental survey, the director has gathered the following information:
The department generates approximately database requests per hour.
Each database search takes an average of minutes hours to complete.
The cost of renting a computer terminal is $ per hour.
The cost of keeping an engineer idle while they wait for an available terminal is
$ per hour.
The director assumes that:
The arrival of database requests follows a Poisson distribution.
The time it takes to process a request service time follows an exponential
distribution.
a Based on the information provided, determine how many computer terminals the
director should rent in order to minimize the total costs for the department. marks
b Draw a flowchart showing your proposed queuing system marks
c Under the system you proposed in part a calculate the expected waiting time for
an engineer before they can access a terminal to begin their database search. marks
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock