Q4. (40 pts) Consider the following table. SA= system analyst; SD= system designer; SC= system coder a. (15 pts) Draw up a PERT chart for the activities above, and identify the critical path (PERT). b. (10pts) Draw up a resource table showing the number of each type of resource needed on each day of the project. c. (15 pts) Generate resource histogram for both SD and SC