Question: please draw the diagram!! Relationship Process Map (Report Assignment) A supplier of machined components for industrial machinery le power tools, pumps, motors, compressors) operates a
please draw the diagram!!
Relationship Process Map (Report Assignment) A supplier of machined components for industrial machinery le power tools, pumps, motors, compressors) operates a factory that includes a forge shop, machine shop, and finishing department. Many of the parts produced by the company are fabricated through these three departments. Because of this, the factory is laid out as three large square rooms, arranged in-line to from a rectangle with an aspect ratio of three-to-one. Each room is 200 ft by 200 ft. The rectangle runs from north to south, with the forge shop on the south end. Large doors are located on the south wall for work entering the factory and on the north wall for tinished products exiting the factory. For one part of particular Interest here, the raw material is a steel billet that is purchased from a steel wholesale supplier. The billets arrive in pallet loads of 100 billets at the shipping and receiving department, which is a building that is 35 ft by 50 ft tocated 25 from the south wall door of the factory. The shipping and receiving department inspects the parts and sends them by forklift truck to be stored in the company's warehouse that is located in another building 500 ft away from the factory in a southerty direction. The warehouse is 200 ft by 200 ft with its entrance door on the north wall. When a production order for the part is received, a factory forklift truck is dispatched to the warehouse to retrieve the billets. The forklift truck must wait while the warehouse crew locates the billets in storage, takes a pallet out of storage using the same type of forklare truck, and delivers the pallet to the dock where it is transferred to the factory forklift. The pallet is then brought back to the factory and delivered to the forge shop. The billets must wait their turn in the production schedule before being pressed into the desired shape by one of the forse presses. From the forse shop, the parts are maved to the machine shop where they are machined on two different machine tools, a milling machine and a dil press. From the machine shop, the parts travel to the finishing department for painting and baking ito cure the paint). From the finishing department, the parts are moved back to the machine shop, where additional milling is accomplished to provide two machined metal surfaces that will mate with other components in the final product. The parts are then moved to the shipping and recering department for shipment to the customer Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
