Question: please draw the network on paper. Immediate Activity Optimistic Pred Most Pessimistic Likely 3 6 A Nonel 21 B Nonel 41 LO 6 None 2

please draw the network on paper.
please draw the network on paper. Immediate
Immediate Activity Optimistic Pred Most Pessimistic Likely 3 6 A Nonel 21 B Nonel 41 LO 6 None 2 6 CO 10 D 5 81 11 E Al 101 10 16 F B 21 41 6 G B 6 71 14 H cl 31 3 3 21 2 4 J E,F GH D,1,JI lo 8 15 on 00 | 4 5 12 1. Construct the PERT/CPM network for this project 2. Calculate the ES, LS, EF, LF and Slack for each activity of the project? 3. What is the probability of completing the project within 30 days