Question: please follow the assignment instructions and use the template to complete it for the Mental health wellness for children event. 8 1 of 3 MGMT8370


please follow the assignment instructions and use the template to complete it for the Mental health wellness for children event.



8 1 of 3 MGMT8370 ASSIGNMENT 3 Risk Register ASSIGNMENT DETAIL & INSTRUCTIONS Due: Refer to Instructional Plan Weight: 15% Late Assignments: 10% reduced grade per day (Maximum of 3 days). Assignments submitted more than 3 days late will receive a zero. Alternative arrangements must be made in advance. Assignment: This is an individual assignment; student collaboration is not acceptable. There are many ways to approach risk management. Students must use the concepts and best practices taught in MGMT8370. The assignment includes a risk register template, RBS, Heat Map, and Impact Table. Students provide risk context (background) and the cost table. Assignment Checklist: READ ALL THE INSTRUCTIONS Use the Heat Map, RBS and Impact table provided in the assignment instructions. Use the assignment template provided. Add the project context from assignment 2 (it is ex xpected for group members to have the same context) Add costs and effort (duration if app addition to Practical Assignment 3. Complete all the fields in the risk register as instructed. Show calculation details within the risk register Check your work and validate your calculations. Instructions: 1. Review the rubric. 2. Use the template provided. Do not change the formatting or save it as a PDF. 2.1. There are 3 sections in the template, complete all 3 sections (Risk Register, Project Context, and Cost Table). 3. Risk Register 3.1. Fill in all the fields in the risk register template. 3.2. Do not use risks created by your group. Create 1 new risk threat and 1 new risk opportunity 3.3. Complete the risk register using this assignment's RBS, Heat Map, and Impact table. 3.4. All risks must include EMV Cost and EMV Duration and the detailed calculations (costs and duration/effort) must be included. These values must be in your cost table. 3.5. Do not place EMV calculation details outside the risk register, they will not be graded. 4. Project Context 4.1. Copy the project context created by your group for Assignments 1 and 2 (Charitable Event), group members are expected to have the same context. 4.2. Risk registers missing the project context will automatically lose 10%. Conestoga College MGMT8370 Winter 2024 MGMT8370 ASSIGNMENT 3 Risk Register 5. Cost Table 5.1. Begin with the cost table created for Practical Assignment 3. Individually make any adjustments and improvements recommended by your faculty. 5.2. Add at least 2 new costs and descriptions from what your group submitted. Group members cannot have the same new costs. All costs incorporated into your risk calculations must be included in this table. 6. RBS 6.1. Use the RBS provided. If the RBS does not include a sub-category that fits your risk, add it to your risk register with an explanation. Do not add new categories. 6.2. Potential bonus marks if the new sub-category aligns with the risk statement and context 7. Double-check your calculations before submitting the assignment. MGMT8370 HEAT MAP - CHARITABLE EVENT Threats Opportunities -5- -5- - 5 - -5- -5- .5 - 91% - 99% -4 - - 4 - 4 - 91% - 99% Very Very Very - 4 High High Very High High High High High High High High High Very High -5- 4 -4- - 3 76% - 90% 76% - 90% - 3 - 4 - - 4 Very Med High High High High Med High High High - 3. 26% - 75% - 3- - 3 - 3 26% - 75% - 3 -4 -4 - 4 Med Med Med High High High High Med Med Med Medium Medium Probability -1- -1 - Probability 6% - 25% % - 25% Very - 2- -2- -3 . 3- - 3- - 3 - 2. - 2 . Very Low Low Med Med Med Med Low Low Low Low Low Low - 1- - 1- - 1- - 1- - 1 - 1% - 5% Very -2 - 2 - - 2 Very 1% - 5% Low Low Low Low Low Low Low Low Low Low Very Low Very Low -5- -5- -2- -3- - 4- -4 - - 3- - 2 - Very Very Very Very Low Med High High High Med Low Low ImpactAssignment 3 Instructions & Case... V calculations must be included in this table. 6. RBS 6.1. Use the RBS provided. If the RBS does not include a sub-category that fits your risk, add it to your risk register with an explanation. Do not add new categories. 8 3 of 3 6.2. Potential bonus marks if the new sub-category aligns with the risk statement and context 7. Double-check your calculations before submitting the assignment. MGMT8370 HEAT MAP - CHARITABLE EVENT Opportunities Threats - 5- - 5 - -5- - 5 - - 5 - -5- 91% - 99% 91% - 99% - 4 Very Very Very Very Very Very High High High High High High High Very High Very High - 5 -5- -5- - 3 76% - 90% 76% - 90% 4 . Very Very Very Very Med Med High High High High High High High High High High - 4 4- - 4 - 4- - 3- - 3 - 3 26% - 75% 26% - 75% - 3- -3- - 3. Med Med High High High High Med Med Med Med Medium Medium - 1- Probabilit 6% - 25% - 3 - 2- - 2 Probability 5% - 25% - 3 - 3- - 3 Very - 2. - 2 - Very Low Low Med Med Med Med Low Low Low Low Low Low -1- -1 - - 1 - - 1 - - 1- -1- - 2 - - 2- 1%- 5% 1% - 5% Very Very - 2 - 2 - Very Very Low Low Low Low Low Low Low Very Low Very Low Low Low Low - 1 - -5- - 5- - 1- - 2 - 3. - 4 . 4 - 3- - 2 - Very Very Med Med Very Very High Low Low High Low Low High High Impact Conestoga College MGMT8370 Winter 2024 MGMT8370 ASSIGNMENT 3 Risk Register Charitable Event Impact Table Impact Rating Cost Time (Days) -1- 5 Very High Technology Technical Risks Process Project Management Management Reporting Charitable Event Permits External Environmental Employe or Volunteer Internal Procurement Conestoga College MGMT8370 Winter 2024Do Not change the format of this table. Do not change the page orientation or size. Use the Impact Table and Heat Map from the assignment case (not any other source). As an individual (not a group), copy the cost table from Practical Assignment 3 and update (individually) to include any improvements recommended. Add at least 2 new costs as needed to reflect your risk statement. Risk statements used in group assignments will not be accepted. Project Context Group Number Group Members & Student Number Project Description Project Prioritics Event Date Project Duration Baseline Budget Risk Reserve | Cost Descripion | Rate | Frequency / Duration / Unit | . 1 [ - o 1 | "I | ! [ o MGMTE370 Winter2024
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
