Question: Please fully Draw out the project network to show the ES,LS,EF,LF and Slack, Critical Path in the drawing. 2. A project network is shown below.

Please fully Draw out the project network to show the ES,LS,EF,LF andPlease fully Draw out the project network to show the ES,LS,EF,LF and Slack, Critical Path in the drawing.

2. A project network is shown below. Use a forward and a backward pass to determine the critical path, and then fill out the table below. Activity times are in weeks