Question: Please help! For the project shown in the following table, calculate the internal rate of return(IRR). Then indicate, for the project the maximum cost of

Please help!  Please help! For the project shown in the following table, calculate

For the project shown in the following table, calculate the internal rate of return(IRR). Then indicate, for the project the maximum cost of capital that the firm could have and still find the IRR acceptable. The projects IRR is 19.77 %. (Round to two decimal places.) The maximum cost of capital that the firm could have and still find the IRR acceptable is %. (Round to two decimal places.). Enter your answer in answer box