Question: PLEASE help me solve this , i need a table and the formula to get the answers. I keep getting it wrong. Attched is my

PLEASE help me solve this , i need a table and the formula to get the answers. I keep getting it wrong. Attched is my work that isnt correct.
Plot Settlement vs time
U=cc,ult100%,Tv=CrtHdr2=0.1(1)132=0.00059
46z=(118)(10)=11801042
c,ult=(H')(CY(1+e0))log10(5'm6'0)
=130.07log10(5000244.4)
=1.1929FIGURE 11.30 Soil profile for Problems 11.11 and 11.12.11.11 A fill is to be placed on the soil profile shown in Figure 11.30. The groundwater table is
level with the original ground surface. Use the simplified method to develop a plot of consolidation settlement versus time. Continue the plot until U>99%. Do not apply any correction for the construction period.
Note: As consolidation settlement occurs, some of the fill will become submerged beneath the groundwater table. The resulting buoyant force will reduce zf' and thus reduce the consolidation settlement. However, this effect is small for this problem and may be ignored.
PLEASE help me solve this , i need a table and

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!