Question: Please help me with this question and show work please, thank you! A copy machine is available 18 hours a day. On a typical day,

Please help me with this question and show work

Please help me with this question and show work please, thank you!

A copy machine is available 18 hours a day. On a typical day, the machine needs to process 280 jobs. Each job takes about 1.5 minutes on the machine: 1 minute is setup time (logging in, defining the job) and 0.5 minute of which is processing time. About 20% of the jobs need to be reworked, in which the set-up time and the processing time have to be repeated once. In the remaining time, the equipment is idle. You would need to show steps and use 2 decimal places. (a)[1] Draw a tree diagram to show the breakdown of equipment time. (b)[2] Identify and calculate component and total non-value added times in minutes. (c)[2] Identify and calculate component and total value-added times in minutes. (d)[2] Calculate total waste time in minutes. Give a detailed breakdown of total waste time. (e)[1] Put all time values you have just calculated in the tree diagram. (f) [1] What is the OEE of the equipment? (percentage, 2 decimals, i.e. 23.67\%) (g)[1] What is the percentage of wasted work time? (i.e. 23.67\%)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!