Question: [ Supplement 7 ] Bottleneck Analysis A production system at a manufacturing company is given in the flowchart below. The boring operation occurs separately from,

[Supplement 7] Bottleneck Analysis
A production system at a manufacturing company is given in the flowchart below. The boring operation occurs separately from, and simultaneously with, the cutting and milling operations. A product needs to go through only one of the four assembly operations. The four assembly operations are in parallel.
Answer the following questions based on the flowchart.
Write your final answer only (without intermediate steps) for the fill-in-the-blank questions.
Question 10(5 points)
Which operation is the bottleneck?
Question 10 options:
Assembly
Welding
Milling
Cutting
Boring
Question 11(5 points)
Question 11 options:
The bottleneck time =
minutes per unit. Round the final answer to two decimal places, e.g.,0.12, when necessary.
Question 12(5 points)
Question 12 options:
For the entire production system, the throughput time =
minutes. Round the final answer to two decimal places, e.g.,0.12, when necessary.
Question 13(5 points)
Question 13 options:
If the company operates 2 shifts per day, 8 hours per shift, and 20 days per month, the capacity of this production system =
units per month. Round the final answer to two decimal places, e.g.,0.12, when necessary.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!