Question: [ Supplement 7 ] Bottleneck Analysis A production system at a manufacturing company is given in the flowchart below. The boring operation occurs separately from,
Supplement Bottleneck Analysis
A production system at a manufacturing company is given in the flowchart below. The boring operation occurs separately from, and simultaneously with, the cutting and milling operations. A product needs to go through only one of the four assembly operations. The four assembly operations are in parallel.
Answer the following questions based on the flowchart.
Write your final answer only without intermediate steps for the fillintheblank questions.
Question points
Which operation is the bottleneck?
Question options:
Assembly
Welding
Milling
Cutting
Boring
Question points
Question options:
The bottleneck time
minutes per unit. Round the final answer to two decimal places, eg when necessary.
Question points
Question options:
For the entire production system, the throughput time
minutes. Round the final answer to two decimal places, eg when necessary.
Question points
Question options:
If the company operates shifts per day, hours per shift, and days per month, the capacity of this production system
units per month. Round the final answer to two decimal places, eg when necessary.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock