Question: The following values were found from the corrected load versus penetration curve after completing a CBR test. Load at 2.5mm penetration = 550kg and
The following values were found from the corrected load versus penetration curve after completing a CBR test. Load at 2.5mm penetration = 550kg and at 5mm penetration = 936kg. Based on the above values Find: 1) CBR values for 2.5 mm penetration and 5.0 mm penetration. 2) Find the reported CBR value.
Step by Step Solution
3.43 Rating (156 Votes )
There are 3 Steps involved in it
Solution Given Datag STEP I Values were found From the correc... View full answer