Question: please help with all of problem 1 1. Below is the description of a new apartment building. Please use the attached pages from R.S. Means

please help with all of problem 1  please help with all of problem 1 1. Below is the
description of a new apartment building. Please use the attached pages from
R.S. Means book, to provide an estimate of the cost per square
foot. Assume the R.S. Means cost data is from 2021. a. The
building is a commercial five-story apartment building. b. The total gross area

1. Below is the description of a new apartment building. Please use the attached pages from R.S. Means book, to provide an estimate of the cost per square foot. Assume the R.S. Means cost data is from 2021. a. The building is a commercial five-story apartment building. b. The total gross area is 75,000 square feet. c. The building will be bid-out and constructed in year 2023 . d. The building has a perimeter of 520 lincal feet. e. The building is located in Carbondale, Illinois. f. All stories have the same story height at 10 feet 4 inches (104). g. The exterior wall is Brick Veneer. h. The structural system is Reinforced Concrete. i. Assume that cost escalation is 3% per year. j. No basement. k. Contractor Fees of 25% (already included in S/SF by book). 1. Architect Fees must be removed, as you budget this separately. The estimated cost per square foot is: _ per square foot s. COMMERCIAL/INDUSTRIAL/ M.460 Office, 2-4 Story INSTIOTONAL Costs per square foot of floor area Common additives Derition Cores ond morile Dieary teod pleded pim ened Ar whi par 139000 13600 Model costs calculated for a 3 story building Office, 2-4 Story with 12 story height and 20,000 square feet of floor area A. sunsmactute 1. Sthu D. sekvers D10 cenving E. EOUPMENT A FURWISHENS Total Bulding Cost 18375 Thention Foatare, Dosidential/Commercial 1. Below is the description of a new apartment building. Please use the attached pages from R.S. Means book, to provide an estimate of the cost per square foot. Assume the R.S. Means cost data is from 2021. a. The building is a commercial five-story apartment building. b. The total gross area is 75,000 square feet. c. The building will be bid-out and constructed in year 2023 . d. The building has a perimeter of 520 lincal feet. e. The building is located in Carbondale, Illinois. f. All stories have the same story height at 10 feet 4 inches (104). g. The exterior wall is Brick Veneer. h. The structural system is Reinforced Concrete. i. Assume that cost escalation is 3% per year. j. No basement. k. Contractor Fees of 25% (already included in S/SF by book). 1. Architect Fees must be removed, as you budget this separately. The estimated cost per square foot is: _ per square foot s. COMMERCIAL/INDUSTRIAL/ M.460 Office, 2-4 Story INSTIOTONAL Costs per square foot of floor area Common additives Derition Cores ond morile Dieary teod pleded pim ened Ar whi par 139000 13600 Model costs calculated for a 3 story building Office, 2-4 Story with 12 story height and 20,000 square feet of floor area A. sunsmactute 1. Sthu D. sekvers D10 cenving E. EOUPMENT A FURWISHENS Total Bulding Cost 18375 Thention Foatare, Dosidential/Commercial

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Finance Questions!