Question: please i dont have time harry up Q1. Based on the table below, solve the questions (1-4). (12 Marks). Activity Predecessor A B Optimistic Duration

please i dont have time harry up Q1. Based on theplease i dont have time harry up
Q1. Based on the table below, solve the questions (1-4). (12 Marks). Activity Predecessor A B Optimistic Duration 2 5 Pessimistic Duration 10 15 3 12 Most Likely Duration 4 8 2 10 7 14 1 A B H B DE E,F H C D E F G 4 4 9 11 9 13 21 17 7 2 5 1. What is the probability that the project finishes in less than 40 days. 2. What is the probability that the Activity "G" finishes between 3 and 5 days. 3. Estimate project completion date with at least a 96% confidence level. 4. What is the probability that node "D" has a float more than Zero

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!