Question: PLEASE I JUST NEED A ANSWER FOR D READ IT AND ANSWER THANK YOU As part of a major plant renovation project, the industrial engineering

PLEASE I JUST NEED A ANSWER FOR "D" READ IT AND

PLEASE I JUST NEED A ANSWER FOR "D" READ IT ANDPLEASE I JUST NEED A ANSWER FOR "D" READ IT AND ANSWER THANK YOU

As part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output of 240 units per eight-hour day. Task times and precedence relationships are as follows: Immediate Predecessor Task a b Duration (minutes) 0.2 0.4 0.2 0.4 1.2 1.2 1.0 a b d d f e, f Click here for the Excel Data File Do each of the following: a. Determine the minimum cycle time, the maximum cycle time, and the calculated cycle time. (Round your answers to 1 decimal place.) The minimum cycle time The maximum cycle time Calculated cycle time 1.2 minutes per unit 4.6 minutes per unit 2.0 minutes per unit b. Determine the minimum number of stations needed. (Round your answer to the next whole number.) Minimum number of stations c. Assign tasks to workstations on the basis of greatest number of following tasks. Use longest processing time as a tiebreaker. If ties still exist, assume indifference in choice. Work stations Following Tasks A, B, DC 1 E UL TE IV G d. Compute the percentage of idle time for the assignment in part d. Use the actual bottleneck cycle time in your calculation. (Round your answer to 2 decimal places.) Percentage of idle time 42.50%

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!