Question: Please I need the answer as soon as possible. Use the process information provided in the following table, when the sequence of flow is ABCD

Please I need the answer as soon as possible.
Use the process information provided in the following table, when the sequence of flow is ABCD (any machine can be used if available). Planned Number of Operation Units of Equipment 1 Design Capacity Kby equipment) Utilization Koverall) 90.0% 70.0% 80.0% 73.0% 200 units/hr 155, 145, 185, 135 210 units/hr 120, 235 B 1 D 2 Calculate the maximum (design) capacity and effective capacity. (Round "Effective capacity" to 2 decimal places it neede A. Maximum capacity ( ) units/hr B. Effective capacity ( ) units/hr 3 pts Question 43Step by Step Solution