8. A production process for jellybean manufacturing has been studied. Ten samples each consisting of 100 jellybeans have been inspected. The following table shows the number of defective jellybeans in each sample. Construct the appropriate control chart(s) and determine whether the process is in control. Sample 1 2 3 4 5 6 7 8 9 10 Number of Defective 1 2 2 0 2 1 2 0 2 7 Jelly Beans