Question: Please just help with question #3 E. = this number higher than that for the line without yield loss? 3. Suppose we are examining a

Please just help with question #3 E.
= this number higher than that for the line without yield loss? 3. Suppose we are examining a flow and have determined that BNR = = 500 units per day and RPT = 12 hours (half a day). a. What is the minimum amount of WIP that could be in the system for it to run at full capacity? b. If the system behaves like the best case, what would the throughput be if WIP is set at 250 units? c. If the system behaves like the worst case, what would the throughput be if WIP is set at 250 units? d. If the system behaves like the practical worst case, what would the throughput be if WIP is set at 250 units? e. How much WIP would be required to achieve a throughput of 475 per day if the system behaves like the practical worst case
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
