Question: please let me know if the chart is correct and if anyone can tell me what the answers for :c: is? The Money Pit Mortgage

please let me know if the chart is correct and if

please let me know if the chart is correct and if

please let me know if the chart is correct and if

please let me know if the chart is correct and if

please let me know if the chart is correct and if

please let me know if the chart is correct and if anyone can tell me what the answers for :c: is?

The Money Pit Mortgage Company is interested in monitoring the performance of the mortgage process. Fifteen samples of five completed mortgage transactions each were taken during a period when the process was believed to be in control. The times to complete the transactions were measured. The means and ranges of the mortgage process transaction times, measured in days, are as follows: Sample Mean Range 1 21 7 2 17 12 3 11 5 4 20 9 5 15 10 6 17 14 7 18 13 8 19 16 9 16 11 10 17 11 11 18 12 12 12 7 13 14 10 14 12 12 15 15 14 Subsequently, samples of size 5 were taken from the process every week for the next 10 weeks. The times were measured and the following results obtained: Sample Mean Range 16 14 9 17 17 12 18 12 7 19 18 5 20 20 13 21 22 14 22 16 12 23 25 11 24 25 23 21 9 7 Click the icon to view the table of factors for calculating three-sigma limits for the X-chart and R-chart. a. Construct the control charts for the mean and the range, using the original 15 samples. Set up the R-chart by specifying the center line and three-sigma control limits below. (Enter your responses rounded to two decimal places.) R-chart Set up the R-chart by specifying the center line and three-sigma control limits below. (Enter your responses rounded to two decimal places.) R-chart UCLR = 22.98 = 10.87 LCLR = 0.00 Set up the x-chart by specifying the center line and three-sigma control limits below. (Enter your responses rounded to two decimal places.) x-chart UCLE = 22.40 = 16.13 LCL = 9.86 b. On the control charts developed in part (a), plot the values from samples 16 through 25 and comment on whether the process is in control. Choose the correct R-chart for the data below b. On the control charts developed in part (a), plot the values from samples 16 through 25 and comment on whether the process is in control. Choose the correct R-chart for the data below. . OB O C. OD. UCLR UCLR tad UCLR. - UCLR Range Range Range Range 47 LCLR ALCLR 47 LCLR 47 LCLR 015 17 19 21 23 25 15 17 19 21 23 25 Sample Number Sample Number 15 17 19 21 23 25 Sample Number 15 17 19 21 23 25 Sample Number Choose the correct x-chart for the data below. B. 26 267 UCLE UCLE 22 UCL Average Average Average 14717--E--- Average LCLE 104 LCLE 615 17 19 21 23 25 21 LCLETT LCL- 15 17 19 21 23 25 Sample Number 15'17 1 21 23 25 Sample Number 15 17 19 21 23 25 Sample Number Sample Number The entire process is control. c. In part (b), if you concluded that the process was out of control, would you attribute it to a drift in the mean, or an increase in the variability, or both? The process variability is statistical control and the process average is statistical control. Therefore, the entire process is 7 control

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!