Question: Please show all work. Thank you 3.23. Consider an E2/M/1/4 model with the arrival rate of 3 jobs per hour and a service rate of

Please show all work. Thank you
3.23. Consider an E2/M/1/4 model with the arrival rate of 3 jobs per hour and a service rate of 4 jobs per hour. Compute the steady state probabilities and the system performance measures of utilization, CTS, WIPs, and throughput. Note that this system has a capacity of 4 jobsStep by Step Solution